Thank you to all who attended the 2019 conference.
The presentations can be found at this link (Google Drive)
The 2019 topics that were presented are as follows:
Topics | Presenter |
---|---|
Welcome – FSRUG History, Logistics, Meeting Objectives, Expectations | FSRUG President - Taylor Smith |
Vogtle U1 Trip due to Feedwater Transient | Stephen Brink - Vogtle |
Valve Retrofits | IMI CCI - Kurt Christianson |
Troubleshooting Vibration Problems with Motion Amplified Video | Mechanical Solutions, Inc. (MSI) - Derek Stack, Andy Lerche |
The Deeper Look at Feedwater Heater Internals | Godrej Americas Inc. - Karin Duke |
Standby Feed Pump Overhaul | Rotating Equipment Repair (RER) - Kurt Weis, Mark Barber |
SGFP Turbine Casing Fire | Pete Beavers - Calvert Cliffs |
Recent Upgrade Projects | Westinghouse |
Pump Technology | Sulzer |
Pop-A-Plug Tube Plugging System | Curtiss-Wright EST Group - Eric Tinnerman |
PM Matrix Discussion | Taylor Smith - Comanche Peak |
Ovation Feedwater Controls Lessons Learned - RFPT Trip | Mary McCague - Braidwood |
New FW Flow Venturi Elements | Walter Bischoff - Brunswick |
Mini Vibration Short Course - General Vibration Troubleshooting | Mechanical Solutions, Inc. (MSI) - Andy Lerche, Derek Stack |
Maximizing Wrench Time During an Outage | The Merrick Group - Keith Owensby |
Main Feedwater Pump Control Fluid Leak | DC Cook - Amanda Mast |
INPO Industry Event Insights | Eric Fulton - Cooper |
Inconsistencies in Valve Data Sheets & Design Specs Causing Lowered Valve Performance and Excessive Maintenance | MB Valve - David Bala |
Google Drive intro/discussion | Taylor Smith - Comanche Peak |
Gearing & Charging Pump Drives | Chalmers & Kubeck - Chad Criddle, John Henwood |
Feedwater Pump Turbine Overhaul | Eric Fulton - Cooper |
Feedwater Heater Replacement Feedwater Heater Level Control Upgrade | Walter Bischoff - Brunswick |
Feed Reg Valve Failed Closed During Power Ascension | John Dempsey - Byron |
Diablo Canyon Vibration Case Study | Bently Nevada - Steve Ciesla PGE Diablo Canyon - Mike Moren |
Delivering the Nuclear Promise EB 16-25 Critical Component Reduction EB 16-16 High Cost, Noncritical PM Reduction EB 17-03a Value-Based Maintenance Delivering EB 16-33 System Health Reporting Efficiencies EB 17-18 Optimizing Strategic Engineering, Engineering Response Team and Component Maintenance Support | Taylor Smith - Comanche Peak |
CW Pump Discharge MOV Failure | Kelly Oetting - Point Beach |
Continuous Remote Monitoring System | Michael Mancini - Hydro, Inc. |
Big Data | Framatome - Ryan Marcum |
2018 Significant FW Events | Eric Fulton - Cooper |