2012 Conference

FSRUG Conference – 2012

Agenda Topic Facilitator/

Presenter

Company Presentation
Welcome / Utility Introductions Bill Phillips / All Ft. Calhoun / All click here
Ft. Calhoun EPU – Replacement FW Pump Ranald Patrick Clyde-Union Pumps click here
Valve Solutions Kurt Christianson Curtiss-Wright click here
Entergy Fleet FW System Vulnerability Review Doug Phillips Waterford / Entergy click here
Nuclear Construction Update – AP1000 Melissa Loeper Duke Energy click here
Feed System Analysis Flowserve Pumps click here
Maximizing Asset Uptime Furmanite click here
Maintaining the Flow! – FW Pump Testing Jim Healy Healy Engineering click here
Oil Oxidation Impact on FW Pump & Turbine Performance Walter Bischoff Salem / Hope Creek click here
High Energy Feed Pump Maintenance Jim Neely Hydroaire Pumps click here
2011 Operating Experience for FW and related systems Mike Ballard INPO ER Group Proprietary
FW Control System Reliability Bill Leska Invensys click here
Heater OE All All
Open Forum All All
Power Uprate Lessons Learned Kelly Oetting Point Beach click here
FWP Bearing Operating Temperature Issue-Resolution Martin Cabiro Prarie Island click here
FEA Analysis – Horizontal Joint Repair Kurt J Weis Rotating Equipment Repair, Inc click here
SGFP Minimum Flow Operations Art Washburn Sulzer Pumps click here
Power Uprates and FW Heaters Iver Jacobson True North click here
Feedwater Heater Level Optimization Iver Jacobson True North click here
FW Control Digital Upgrades Approach & Experience Vaughn Thomas Westinghouse click here