FSRUG Conference – 2014
Agenda Topic | Facilitator/
Presenter |
Company | Presentation |
Basic Principles of the Eddy Current Inspection Technique | Steven Schaefer | Curtiss Wright / Anatech | click here |
SGFP Coupling leads to Reactor Trip (failure analysis paper) | Zack Martin | Calvert Cliffs | Proprietary |
2013 FW Operating Experience Roundup | Eric Backus | LaSalle | click here |
BFN U3 FW Long-Cycle Piping Separation | Adrian Gallegos | Browns Ferry | click here |
SGFPT Controls Mod – Electric Actuators | Jon Allen | Calvert Cliffs | click here |
Secondary Troubleshooting | Edward Keve | DC Cook | click here |
Condenser Hotwell Damage & Long Cycle Cleanup Valve Leakage 2013 | Cory Foskey | Hatch | click here |
Lessons Learned Discussion of Digital Control Upgrades | Tim Frost | Invensys | click here |
Introduction to Vibration and Related Test Methods for Troubleshooting | Eric Olson | Mechanical Solutions | click here |
Case Histories: Applying Vibration and Related Test and Analysis Methods to Solve Problems | Eric Olson | Mechanical Solutions | click here |
LP FWH Drain Cooler Noise | Scott Ferguson | Prairie Island | click here |
Feedwater Pump Thrust Bearing Failure | Kurt Weis | Rotating Equipment Repair | click here |
SGFP Lube Oil Systems & Maintenance Part 2 | Art Washburn | Sulzer | click here |
Stuffing Box Design & Configurations | Art Washburn | Sulzer | click here |
Heater Drain System Transients | Mike Turner | Shearon Harris | click here |
Loss of Main Feed Pump Lube Oil | Mike Turner | Shearon Harris | click here |
Motor and Pump Base Foundational Repair | Jason Lewis | Furmanite | click here |
High Performance Sealing Solutions for Nuclear Feed Water Pumps | Doug Reising | Flowserve | click here |
Drafting Technology for Improving Maintenance and Procedures | Doug Reising | Flowserve | click here |
FW Control Valves in Nuclear Power | Curtis Sterrud | CCI | click here |
Non-Intrusive Ultrasonic Flow and Temperature Measurements | Yuri Gurevich | AMAG | click here |